Acerca de

dedalus_057.jpg

DEDALUS 30.7 TCL

FIXED TELEHANDLER

portata-massima (1).png

MAXIMUM CAPACITY

3,000 kg 

18-183803_lightning-icon-png-electric-po

73.4 kW (98 hp)

MAXIMUM POWER

altezza-massima.png

MAXIMUM LIFTING HEIGHT

6.35 m

potenza-massima.png

ENGINE BRAND

Kubota

The Dedalus is the most agile among the Dieici telehandlers. Features include high-quality interiors, large windows for maximum visibility and a sound-absorbing roof.

Direction of travel and boom are controlled by the new CAN-bus single-lever joystick and hydrostatic transmission allows maximum forward travel precision even at full speed.

The new ROPS and FOPS approved cab is provided with a shock absorption system, with integrated adjustment consisting of 4 supports that reduce impact and jolts at 360°.

DEDALUS IN ACTION

What is my first step to select a contractor?


You should always check the license of the contractors you like to obtain estimates from. You can visithere to obtain a history of the contractor you like to possibly work with.

"http://www.cslb.ca.gov/OnlineServices/CheckLicenseII/CheckLicense.aspx" Make sure the license is active and the contractor maintains the worker's comp insurance.




What is my first step to get a quote?


The first step is to obtain a concept design based on your style of layout, material and wish list of items you like to include in your project. We offer first visit complimentary review of your project and help you with what to expect from the designer and how to get started for the conceptual plan design with a minimal fee which will be fully credited toward your project contract total.




Do you offer video conceptual design vs. paper design layout?


We offer both. We can show you the concept design in a video format if you are a visual person. Also, we offer the plan view in large scale for top view evaluation of the concept plan.




What is the process after I obtain my plan and final design?


We offer a full-service delivery and completion of association paper processing, obtaining city permit paperwork and resubmittal of any correction from the association for final approval. We guarantee all submission for final approval by the association and city permit final.




How soon can I start my project?


You should allow 4-6 weeks for design concept, association submission for approval and city permit processing (if needed) before construction start date. Associations are very clear on not starting your project until a written approval or partial approval letter is issued.





SPECS

SUPPORT

Untitled design (6).jpg
Untitled design (5).jpg
Untitled design (8).jpg
Untitled design (7).jpg
Untitled design.jpg